AIM Processes

Processes:

AIM Processes, askhareesh blog for Oracle Apps

1) Business process architecture (BP)
Business process architecture addresses the organization’s business processes and aligns them with the business requirement and applications to be implemented. High level process designs (BP0.070) and future process model (BP0.080) are a part of this.

2) Business requirements Definition (RD)
Business Requirements Definition defines the business needs that must be met by the implementation project .This is RD 0.020 which is the current business needs.

3) Business Requirement Mapping (BR)
Business requirement mapping compares the future business requirements to standard oracle application functionality and identifies the gaps. Business requirements scenarios (RD0.050) are then mapped to oracle functionality.

4) Application and Technical Architecture (TA)
During Application and Technical Architecture, the information systems are designed to reflect the business vision

5) Module Design and Build (MD)
Module design and build produces custom application extensions for gaps in functionality identified during BR.Custom application extensions include program modules( forms, reports, alerts and database triggers) that must be designed, built and tested before being transitioned in the new system.

6) Data Conversions (CV)
Data conversion defines the tasks and deliverable to convert legacy data to oracle application base tables.

7) Documentation (DO)
It defines the documentation requirements for the project and establishes which of the documentation tasks are required.

8) Business System Testing (TE)
Early in the project life-cycle, Business System Testing focuses on linking test requirements back to business requirements and securing project resources needed for testing.
Business System Testing provides a formal integrated approach to Testing

9) Performance Testing (PT)
Performance Testing enables you to define, build, and execute a performance test. The Performance Testing team defines the scope of testing and relates it to point-in-time snapshots of the transactions expected in the real production system

10) Adoption and Learning (AP)
Adoption and Learning establishes a measurement system that provides an evaluation of organizational performance to help make sure that expectations are met during implementation and after production cut-over

11) Production Migration (PM)
Production Migration moves the company, system, and people to the new enterprise system.

Read about AIM Phases


Read More »

AIM Phases

AIM Phases, askhareesh blog for Oracle Apps
 Application Implementation Methodology
  • Oracle’s Application Implementation Methodology is a proven approach to implement Oracle Applications.
  • AIM defines an organization’s business needs at the beginning of the project and maintains their visibility through out the implementation. 
  • AIM project is conducted in phases. The phases provide quality and control checkpoints to coordinate project activities that have a common goal.
Phases:

1) Definition: During this phase, we plan the project ,review the organization’s business objectives ,understand the business processes and evaluate the feasibility of meeting those objectives under time, resources and budget constraints. The emphasis is on building an achievable work plan and introducing guidelines on how the organization will work to achieve the objectives.To achieve an early understanding of current business operations and future processes,the team also performs baseline and process modeling during this phase.If business change is required,then the high level future process designs are drawn.The goal is to identify the future business and system requirements,propose a future business model and determine the current application and information technology architecture.The information gathered provides input to the downstream activities in subsequent phases.All business requirements are associated with planned future business processes.So sharing an accurate understanding of the requirements is a critical success factor to the project.

2) Operations Analysis: The project team develops the business requirement scenarios based on deliverable drawn out of the definition stages.These business requirement scenarios are used assess the level of fit between the detailed business requirement and standard application functionality.Gaps are identified and new proposed solutions are developed.Proposed solutions for gaps evolve into detailed design during a solution design phase.

3) Solution Design: The purpose of the solution design is to develop the detailed design to meet the future business requirements.

4) Build:The coding and testing of all customizations,data conversions and interfaces are done in this phase.Business system testing is performed to validate that the functionality meets the business requirements.If customizations,extensions and conversions are not required ,build phase is still important because it includes business system test..In conference room pilot(CRP),the business system test validates the new system in an environment that resembles the production.

5) Transition: During transition,the project team deploys the new system into the organization.All the elements must come together to tranisition successfully to actual production.During transition users perform an acceptance test of the new system.

6) Production: It marks the last phase of the implementation and the beginning of system support cycle.


Read about AIM Process

 
Read More »

Application Implementation Methodology Documentation List Part2

Application Implementation Methodology Documentation List,Askhareesh.blogspot.com

Data Conversion (CV)CV.010 Define data conversion requirements and strategy
CV.020 Define Conversion standards
CV.030 Prepare conversion environment
CV.040 Perform conversion data mapping
CV.050 Define manual conversion procedures
CV.060 Design conversion programs
CV.070 Prepare conversion test plans
CV.080 Develop conversion programs
CV.090 Perform conversion unit tests
CV.100 Perform conversion business objects
CV.110 Perform conversion validation tests
CV.120 Install conversion programs
CV.130 Convert and verify data

Documentation (DO)
DO.010 Define documentation requirements and strategy
DO.020 Define Documentation standards and procedures
DO.030 Prepare glossary
DO.040 Prepare documentation environment
DO.050 Produce documentation prototypes and templates
DO.060 Publish user reference manual
DO.070 Publish user guide
DO.080 Publish technical reference manual
DO.090 Publish system management guide

Business System Testing (TE)
TE.010 Define testing requirements and strategy
TE.020 Develop unit test script
TE.030 Develop link test script
TE.040 Develop system test script
TE.050 Develop systems integration test script
TE.060 Prepare testing environments
TE.070 Perform unit test
TE.080 Perform link test
TE.090 perform installation test
TE.100 Prepare key users for testing
TE.110 Perform system test
TE.120 Perform systems integration test
TE.130 Perform Acceptance test

PERFORMACE TESTING(PT)
PT.010 – Define Performance Testing Strategy
PT.020 – Identify Performance Test Scenarios
PT.030 – Identify Performance Test Transaction
PT.040 – Create Performance Test Scripts
PT.050 – Design Performance Test Transaction Programs
PT.060 – Design Performance Test Data
PT.070 – Design Test Database Load Programs
PT.080 – Create Performance Test TransactionPrograms
PT.090 – Create Test Database Load Programs
PT.100 – Construct Performance Test Database
PT.110 – Prepare Performance Test Environment
PT.120 – Execute Performance Test

Adoption and Learning (AP)
AP.010 – Define Executive Project Strategy
AP.020 – Conduct Initial Project Team Orientation
AP.030 – Develop Project Team Learning Plan
AP.040 – Prepare Project Team Learning Environment
AP.050 – Conduct Project Team Learning Events
AP.060 – Develop Business Unit Managers’Readiness Plan
AP.070 – Develop Project Readiness Roadmap
AP.080 – Develop and Execute CommunicationCampaign
AP.090 – Develop Managers’ Readiness Plan
AP.100 – Identify Business Process Impact onOrganization
AP.110 – Align Human Performance SupportSystems
AP.120 – Align Information Technology Groups
AP.130 – Conduct User Learning Needs Analysis
AP.140 – Develop User Learning Plan
AP.150 – Develop User Learningware
AP.160 – Prepare User Learning Environment
AP.170 – Conduct User Learning Events
AP.180 – Conduct Effectiveness Assessment

Production Migration (PM)
PM.010 – Define Transition Strategy
PM.020 – Design Production Support Infrastructure
PM.030 – Develop Transition and Contingency Plan
PM.040 – Prepare Production Environment
PM.050 – Set Up Applications
PM.060 – Implement Production Support Infrastructure
PM.070 – Verify Production Readiness
PM.080 – Begin Production
PM.090 – Measure System Performance
PM.100 – Maintain System
PM.110 – Refine Production System
PM.120 – Decommission Former Systems
PM.130 – Propose Future Business Direction
PM.140 – Propose Future Technical Direction



Read More »

Production Migration (PM) : Oracle AIM Document Templates

Business Requirements Definition (RD) : Oracle AIM Document Templates, askHareesh blog for Oracle apps
  • PM.010 - Define Transition Strategy
  • PM.020 - Design Production Support Infrastructure
  • PM.030 - Develop Transition and Contingency Plan
  • PM.040 - Prepare Production Environment
  • PM.050 - Set Up Applications
  • PM.060 - Implement Production Support Infrastructure
  • PM.070 - Verify Production Readiness
  • PM.080 - Begin Production
  • PM.090 - Measure System Performance
  • PM.100 - Maintain System
  • PM.110 - Refine Production System
  • PM.120 - Decommission Former Systems
  • PM.130 - Propose Future Business Direction
  • PM.140 - Propose Future Technical Direction

Complete Oracle AIM Document Templates


Read More »

Adoption and Learning (AP) : Oracle AIM Document Templates

Business Requirements Definition (RD) : Oracle AIM Document Templates, askHareesh blog for Oracle apps
  • AP.010 - Define Executive Project Strategy
  • AP.020 - Conduct Initial Project Team Orientation
  • AP.030 - Develop Project Team Learning Plan
  • AP.040 - Prepare Project Team Learning Environment
  • AP.050 - Conduct Project Team Learning Events
  • AP.060 - Develop Business Unit Managers’ Readiness Plan
  • AP.070 - Develop Project Readiness Roadmap
  • AP.080 - Develop and Execute Communication Campaign
  • AP.090 - Develop Managers’ Readiness Plan
  • AP.100 - Identify Business Process Impact on Organization
  • AP.110 - Align Human Performance Support Systems
  • AP.120 - Align Information Technology Groups
  • AP.130 - Conduct User Learning Needs Analysis
  • AP.140 - Develop User Learning Plan
  • AP.150 - Develop User Learning ware
  • AP.160 - Prepare User Learning Environment
  • AP.170 - Conduct User Learning Events
  • AP.180 - Conduct Effectiveness Assessment

Complete  Oracle AIM Document Templates


Read More »

Performance Testing(PT) : Oracle AIM Document Templates

Business Requirements Definition (RD) : Oracle AIM Document Templates, askHareesh blog for Oracle apps
  • PT.010 - Define Performance Testing Strategy
  • PT.020 - Identify Performance Test Scenarios
  • PT.030 - Identify Performance Test Transaction
  • PT.040 - Create Performance Test Scripts
  • PT.050 - Design Performance Test Transaction Programs
  • PT.060 - Design Performance Test Data
  • PT.070 - Design Test Database Load Programs
  • PT.080 - Create Performance Test Transaction Programs
  • PT.090 - Create Test Database Load Programs
  • PT.100 - Construct Performance Test Database
  • PT.110 - Prepare Performance Test Environment
  • PT.120 - Execute Performance Test

Complete  Oracle AIM Document Templates


Read More »

Business System Testing (TE) : Oracle AIM Document Templates

Business Requirements Definition (RD) : Oracle AIM Document Templates, askHareesh blog for Oracle apps
  • TE.010 Define testing requirements and strategy
  • TE.020 Develop unit test script
  • TE.030 Develop link test script
  • TE.040 Develop system test script
  • TE.050 Develop systems integration test script
  • TE.060 Prepare testing environments
  • TE.070 Perform unit test
  • TE.080 Perform link test
  • TE.090 perform installation test
  • TE.100 Prepare key users for testing
  • TE.110 Perform system test
  • TE.120 Perform systems integration test
  • TE.130 Perform Acceptance test

Complete  Oracle AIM Document Templates


Read More »

Documentation (DO) : Oracle AIM Document Templates

Business Requirements Definition (RD) : Oracle AIM Document Templates, askHareesh blog for Oracle apps
  • DO.010 Define documentation requirements and strategy
  • DO.020 Define Documentation standards and procedures
  • DO.030 Prepare glossary
  • DO.040 Prepare documentation environment
  • DO.050 Produce documentation prototypes and templates
  • DO.060 Publish user reference manual
  • DO.070 Publish user guide
  • DO.080 Publish technical reference manual
  • DO.090 Publish system management guide

Complete  Oracle AIM Document Templates


Read More »

Data Conversion (CV) : Oracle AIM Document Templates

Business Requirements Definition (RD) : Oracle AIM Document Templates, askHareesh blog for Oracle apps

  • CV.010 Define data conversion requirements and strategy
  • CV.020 Define Conversion standards
  • CV.030 Prepare conversion environment
  • CV.040 Perform conversion data mapping
  • CV.050 Define manual conversion procedures
  • CV.060 Design conversion programs
  • CV.070 Prepare conversion test plans
  • CV.080 Develop conversion programs
  • CV.090 Perform conversion unit tests
  • CV.100 Perform conversion business objects
  • CV.110 Perform conversion validation tests
  • CV.120 Install conversion programs
  • CV.130 Convert and verify data

Complete  Oracle AIM Document Templates


Read More »

Module Design and Build (MD) : Oracle AIM Document Templates

Business Requirements Definition (RD) : Oracle AIM Document Templates, askHareesh blog for Oracle apps

  • MD.010 Define Application Extension Strategy
  • MD.020 Define and estimate application extensions
  • MD.030 Define design standards
  • MD.040 Define Build Standards
  • MD.050 Create Application extensions functional design
  • MD.060 Design Database extensions
  • MD.070 Create Application extensions technical design
  • MD.080 Review functional and Technical designs
  • MD.090 Prepare Development environment
  • MD.100 Create Database extensions
  • MD.110 Create Application extension modules
  • MD.120 Create Installation routines

Complete  Oracle AIM Document Templates


Read More »

Application and Technical Architecture (TA) : Oracle AIM Document Templates

Business Requirements Definition (RD) : Oracle AIM Document Templates, askHareesh blog for Oracle apps

  • TA.010 Define Architecture Requirements and Strategy
  • TA.020 Identify Current Technical Architecture
  • TA.030 Develop Preliminary Conceptual Architecture
  • TA.040 Define Application Architecture
  • TA.050 Define System Availability Strategy
  • TA.060 Define Reporting and Information Access Strategy
  • TA.070 Revise Conceptual Architecture
  • TA.080 Define Application Security Architecture
  • TA.090 Define Application and Database Server Architecture
  • TA.100 Define and Propose Architecture Subsystems
  • TA.110 Define System Capacity Plan
  • TA.120 Define Platform and Network Architecture
  • TA.130 Define Application Deployment Plan
  • TA.140 Assess Performance Risks
  • TA.150 Define System Management Procedures


Read More »

Business Requirements Mapping : Oracle AIM Document Templates

  Business Requirements Mapping : Oracle AIM Document Templates, askHareesh blog for Oracle apps

  • BR.010 Analyze High-Level Gaps
  • BR.020 Prepare mapping environment
  • BR.030 Map Business requirements
  • BR.040 Map Business Data
  • BR.050 Conduct Integration Fit Analysis
  • BR.060 Create Information Model
  • BR.070 Create Reporting Fit Analysis
  • BR.080 Test Business Solutions
  • BR.090 Confirm Integrated Business Solutions
  • BR.100 Define Applications Setup
  • BR.110 Define security Profiles

Complete Oracle AIM Document Templates


Read More »

Business Requirements Definition (RD) : Oracle AIM Document Templates

Business Requirements Definition (RD) : Oracle AIM Document Templates, askHareesh blog for Oracle apps

  • RD.010 Identify Current Financial and Operating Structure
  • RD.020 Conduct Current Business Baseline
  • RD.030 Establish Process and Mapping Summary
  • RD.040 Gather Business Volumes and Metrics
  • RD.050 Gather Business Requirements
  • RD.060 Determine Audit and Control Requirements
  • RD.070 Identify Business Availability Requirements
  • RD.080 Identify Reporting and Information Access Requirements

Complete Oracle AIM Document Templates


Read More »

Business Process Architecture (BP) : Oracle AIM Document Templates


  • BP.010 Define Business and Process Strategy
  • BP.020 Catalog and Analyze Potential Changes
  • BP.030 Determine Data Gathering Requirements
  • BP.040 Develop Current Process Model
  • BP.050 Review Leading Practices
  • BP.060 Develop High-Level Process Vision
  • BP.070 Develop High-Level Process Design
  • BP.080 Develop Future Process Model
  • BP.090 Document Business Procedure


Read More »

Application Implementation Methodology Documentation List

Application Implementation Methodology Documentation List,Askhareesh.blogspot.com

Business Process Architecture (BP)BP.010 Define Business and Process Strategy
BP.020 Catalog and Analyze Potential Changes
BP.030 Determine Data Gathering Requirements
BP.040 Develop Current Process Model
BP.050 Review Leading Practices
BP.060 Develop High-Level Process Vision
BP.070 Develop High-Level Process Design
BP.080 Develop Future Process Model
BP.090 Document Business Procedure

Business Requirements Definition (RD)RD.010 Identify Current Financial and Operating Structure
RD.020 Conduct Current Business Baseline
RD.030 Establish Process and Mapping Summary
RD.040 Gather Business Volumes and Metrics
RD.050 Gather Business Requirements
RD.060 Determine Audit and Control Requirements
RD.070 Identify Business Availability Requirements
RD.080 Identify Reporting and Information Access Requirements

Business Requirements MappingBR.010 Analyze High-Level Gaps
BR.020 Prepare mapping environment
BR.030 Map Business requirements
BR.040 Map Business Data
BR.050 Conduct Integration Fit Analysis
BR.060 Create Information Model
BR.070 Create Reporting Fit Analysis
BR.080 Test Business Solutions
BR.090 Confirm Integrated Business Solutions
BR.100 Define Applications Setup
BR.110 Define security Profiles

Application and Technical Architecture (TA)TA.010 Define Architecture Requirements and Strategy
TA.020 Identify Current Technical Architecture
TA.030 Develop Preliminary Conceptual Architecture
TA.040 Define Application Architecture
TA.050 Define System Availability Strategy
TA.060 Define Reporting and Information Access Strategy
TA.070 Revise Conceptual Architecture
TA.080 Define Application Security Architecture
TA.090 Define Application and Database Server Architecture
TA.100 Define and Propose Architecture Subsystems
TA.110 Define System Capacity Plan
TA.120 Define Platform and Network Architecture
TA.130 Define Application Deployment Plan
TA.140 Assess Performance Risks
TA.150 Define System Management Procedures

Module Design and Build (MD)MD.010 Define Application Extension Strategy
MD.020 Define and estimate application extensions
MD.030 Define design standards
MD.040 Define Build Standards
MD.050 Create Application extensions functional design
MD.060 Design Database extensions
MD.070 Create Application extensions technical design
MD.080 Review functional and Technical designs
MD.090 Prepare Development environment
MD.100 Create Database extensions
MD.110 Create Application extension modules
MD.120 Create Installation routines



Read More »